Project Name:
A404M Maidenhead
Client:
Birse Civils
Description:
•
Liaising
with Network Rail & Highways Agency
•
Working within tight programme constraints
•
Weekend possessions and engineering hours
•
Working with the client on alternative
design and construction methods
•
Carrying out works without causing
disruption to local train services and
public highways
The challenge of this job was that
the bridge had to be demolished and
replaced whilst staying open for
traffic ,with the added complication
of a four-line railway below. This
was achieved by demolishing and
rebuilding the bridge in sections
which ensured that four lanes of
traffic could still flow at all
times.
Works carried out include :
 The construction of bridge abutments
 Wings walls
 Trestle Bases
 VRS base
 Backfilling
 Road construction
|