>> Olympic
Park, Stratford
Main Contractor: VolkerFitzpatrick
Contact: Vince Gannon (Contract Manager)
The scope of work included :
Temporary works – roads. With the access routes
within the site continuously changing as work
progresses we have been involved with the
construction of the temporary roads throughout the
site.
Read More
---------------------------------------------------------------------------------------------------
>> 49 Park Lane Ground Works and Underpinning Works
Main Contractor: McGee Construction
Contact: Bill Hayes (Contract Manager)
Description
Lorclon completed an underpinning project on this
landmark site opposite the Dorchester Hotel which, when
finished, will be the dearest commercial property per
square foot in Europe.
Read More
---------------------------------------------------------------------------------------------------
>>
Beckton Sidings R/C Works
Main Contractor: Cleshar Contract Services
Contact: Steve Davis (Contract Manager)
Description
These works incorporated the installation of
underground drainage works construction of train wash
and interceptor pit. Construction of foundations bases
for various columns and staircases and buildings of the
Blockwork Piers for Pre-cast platformPlanks
.
Read More
---------------------------------------------------------------------------------------------------
>> Rivern Works, Alperton
Main Contractor: - DBC Contact: - Darren Beadle
(Contract Manager)
Description
This project consists of the development of site on
Bridgewater Road, Alperton. The development consists of
a new RC Basement Car Park, Troughed Suspended Ground
Floor and 4 Storey Steel Frame.
Read More
---------------------------------------------------------------------------------------------------
>> Breakspeare Embankment Stabilisation and Landscaping
Lorclon carried out all the Groundworks and Gabion works involved in this package which were constructed on the Chiltern line near Breakspeare Station.
---------------------------------------------------------------------------------------------------
>> Aston Abbots Menage
Lorclon installed a menage on the pirvate property of one of England's leading property speculators and racehorse owners in this quiet Buckinghamshire village. Our work involved installing a drainage system and the initial base topped off with silica (equestrian) sand and a rubber topper. We also carried extensive refurbishment works on the stables.
---------------------------------------------------------------------------------------------------
>> Beckton DLR Sidings
These works incorporated the installation of underground drainage works construction of train wash and interceptor pit,
construction of foundations bases for various columns and staircases and building of the Blockwork piers for pre-cast platform planks.
---------------------------------------------------------------------------------------------------
>> Tesco Doncaster
Lorclon carried out the car park works which included drainage works, surfacing work as well as the foundation work hand standings and lorry parking bays.
---------------------------------------------------------------------------------------------------
>> Brit Oval Cricket Ground
Lorclon's package included all the external drainage and service installation along with the external pavement and hard standing finishes.
---------------------------------------------------------------------------------------------------
>> Skanska- Welwyn Garden City
Lorclon ltd are currently constructing phase one of numerous phases of bases for Skanka on Colt Telecommunications site in Welwyn Garden City. The site will be used as a back-up for data systems around the London area in the case of an energy shortage (power black out) each phase of bases comprise of approximately 900m of ducting, 180m³ of concrete all finished to a very high
standard within a very secure facility.
---------------------------------------------------------------------------------------------------
>> Wembley Park Station
Wembley Park Station went through a major capacity enhancement works to
cope with crowds attending the new stadium. Lorclon was a keen member of the core team that carried out these works specialising in platform demolition and reforming along with the protective hoarding systems.