The structure is a road bridge carrying Claydon Road over the HS2 trace. The total deck span is 70m split into three sections with two sets of piers.
Lorclon’s works included construction of the FRC Pile Caps , Waterproofing , Installation and Infilling of Precast Shells for the Viaduct PiersFRC Abutments, Precast W Beams installation needing a 750te Crane, Construction of the Bridge Deck and Parapet installation.