The project involved the construction of a new RAS/SAS pumping station andthe extension of existing digester side walls at Mogden Sewage TreatmentWorks. The scope included the supply and installation of the pump station,valve and limpet chambers, together with associated pipework, odour controlsystems, drainage and ducting linking the pump station to the digester assets.All works were delivered within a live operational environment and in fullcompliance with DSEAR zoning requirements, confined space regulations andThames Water health and safety standards, demonstrating the team’scapability to safely deliver complex civil and mechanical installations oncritical wastewater infrastructure.